TPG Online Daily

Overnight Paving Along Highway 9 in Boulder Creek

SANTA CRUZ COUNTY – An overnight grinding and paving project in both north and southbound lanes and part Unknownof shoulders along Highway 9 in downtown Boulder Creek between Forest Street and Bear Creek Road will take place for four nights starting Sunday night, June 28. Details are as follows:

 

10-minute delays are anticipated and will consist of reversing one-way traffic control with flagging.

 

to Forest St. to reconnect with Hwy. 9.

 

traffic detoured to Forest St. to reconnect with Hwy. 9

 

south on Hwy. 236 to follow the detour.


 

 

            Bear   Creek Rd. from 8 pm to 6 am for the duration of the project. The CHP will be

            assisting with traffic control and unruly motorists.

 

This roadwork is being performed by Caltrans Santa Cruz Maintenance crews as a safety precaution to provide motorists and cyclists a safer route to travel.

 

Caltrans reminds motorists to move over and slow down when driving through highway construction zones.

 

For more information on this project and for traffic updates on other Caltrans projects in Santa Cruz County, residents can call the District 5 toll free number at 1-831-423-0396 or can visit our website at: http://www.dot.ca.gov/dist05/paffairs/release.htm#scr

Exit mobile version