Cindy Jackson, Board Member, Friends of the Santa Cruz Public Libraries
The parcel tax would be a flat $49.50 per year. Many of our libraries have aged from constant use and need renovations to properly utilize changing technologies and provide comfortable spaces.
Our branches are busier than ever and in fact, the Aptos Branch is the second busiest branch in the entire system on any given day. The Aptos Branch would receive a complete overhaul to modernize the building, to provide separate areas for children and teens and to upgrade 40 year old wiring that is completely inadequate for current use of the library’s computers and patrons’ laptops and tablets.
The measure needs a 2/3 majority to pass so your vote is critical. All renovations that are planned are a result of a lengthy study of all 10 libraries in a Facilities Master Plan conducted by the library. The goal is to have all branches be able to take advantage of the most modern technology by upgrading outdated, inadequate wiring. Worn out, leaky roofs would be replaced where they exist. Spaces would be redesigned and remodeled to accommodate the very busy list of programs and activities that take place in the libraries every single day. Older bathrooms would be replaced, as would outdated boilers and inefficient heating systems.
If you have question, additional information may be found at the Measure S campaign site: ourlibrariesourfuture.org. You may also contact the Friends of the Santa Cruz Public Libraries at 831-621-0800.
•••
Editor’s Note: We invite other viewpoints on this issue. Maximum of 180 words sent to info@cyber-times.com